Home   |   > Solutions   |   > Services   |   > Projects   |   > Contacts
 
alpha
SUB MENU
A Uninterruptible Power Supply System (UPS)
A Electrical & Power  System
A Generator Set
A
A Precision Air Conditioning System
A Fire Detection and Suppression System
A High Sensitivity Smoke Detector System
A

Builders Work

A Raised Access Floor System
A Data Centre Monitoring System (DCMS)
A Water Detection System
A Door Card Access & Biometric Access Control System
A CCTV Surveillance System

 

 

 

 

QUICK CONTACT


s


a


s

a


9-A, 3rd Floor, Block 06,PECHS, Karachi.
Pakistan.

info@alpha.pk

+92 21 3453 3028

+92 21 3454 3243

 

CIVIL WORK SOLUTION
 
CIVIL WORK

 

 

DATA CENTER fabrication and civil works are as much technical and sophisticated as they have to be
ashthetically beautiful. On one hand we have to see the EMI problems for cables etc an

  1. EMI problems from external source and from power cables.

  2. Protection from terrorism attack, such as bomb blast etc.

  3. Bund walls for fuel tanks.

  4. Rodent protections.

The Data Centre perimeter can be constructed with 2-hour fire rated gypsum partition for protection against external threats, hazards and intrusions.





Todays Civil works has to be synchronized with the equipments, sensors etc. Like we have sensitive equipments which can be faulty due to EMI or anti static charges. The design and the execution of civil work can minimized these effects. Inside the Data Centre, partitioning between the internal rooms of the Data Centre can be built with tempered glass partition for easy monitoring of all activities within the Data Centre.

Moreover, if you want to measure the volume of fuel in the tank of the Data Center Generator,
you need to have a symmetrical shape fuel tank.

         
 
 
      Home    |   Solutions   |   Services   |   Projects   |   Contacts
Copyright © 2012 - 2013 | Alpha Technologies International
Design by S.Rahee
l